全國(guó)咨詢熱(rè)線
1580129959860秒(miǎo)人(rén)工(gōng)響應
立足中國(guó),走向全球
BYJ18-21/35油井帶壓作(zuò)業(yè)裝置屬于輕型的(de)液壓控制(zhì)輔助式λ₹★帶壓作(zuò)業(yè)裝置。包括動力部分(fσ✔ēn)和(hé)并口作(zuò)業(yè)部分(fēn)。動力部λ↓ ×分(fēn)為(wèi)撬裝結構,即在動力撬上( ¶shàng)安裝有(yǒu)動力系統、液↓Ω∞λ壓站(zhàn)及遠(yuǎn)程控制(zhì)×"±✘台:井口作(zuò)業(yè)部分(fēn)包括管柱密封系←"統、升降液壓油缸、卡緊系統、平衡卸壓系統、工(gōng)作(zuò)平台、連接盤和 ±≤(hé)司鑽控制(zhì)台以及扶梯、逃生(shēng)滑道(dào)、油管坡<≈∑•道(dào)、水(shuǐ)平調節裝置等附屬部件(jiàn);動力→✘部分(fēn)和(hé)井口作(zuò)業( ≠yè)部分(fēn)被分(fēn)别設計(jì)成- -體(tǐ),便于實現(δ xiàn)安裝和(hé)運輸。
BYJ18-21/35 oil well with pressure operatiβδon device belongs to the light hy∞∑>draulic auxiliary type wiλ©ε↑th pressure operation device. →¥The device including power part and wellhead operβδσation part, and the powerε'δ part is skid-mounted. It is mainly including po♥™←↕wer system, hydraulic station a'∏♥&nd remote control station; Wellhead op'✘®eration part consist←™∑s of string sealing system, lifting hydra ♦<ulic cylinder, clamping system, ∏®ε÷balance pressure relief system, work platfor×εm, connecting plate, and ladder, escapi©±ng slide, tubing ram£♥ps, level adjusting device and other auxiliary co↔♠mponents; Power part ₽≠↑and wellhead operation part are∞✘ designed to be integrated for easy to♥>≠ achieve installation and transpor∞λtation.
鑽機(jī)行(xíng)業(yè)發展趨勢
2022-12-16石油鑽采機(jī)主要(yào)系統是(shì)什(shén)麽
2022-12-16導緻石油機(jī)械高(gāo)壓腐濁的(de)原因有(yǒ∑↔>u)哪些(xiē)?
2022-12-16影(yǐng)響金(jīn)剛石鑽頭的(de)壽命因素淺析
2022-12-16打井機(jī)設備要(yào)因地(dì)制(zhì)宜采取不(bù)¥♦ α同的(de)鑽井方法
2022-12-16[百米鑽機(jī)]百米鑽機(jī)正确使用(yòng)方法
2022-12-16鑽井機(jī)在低(dī)溫工(gōng)作(zuò)時(shí₩≤)的(de)需要(yào)注意什(shén)麽
2022-12-16